Provided detailed window quantifications for over 500 multifamily apartments, Senior Living, Assisted Living, Memory Care, Student Housing, and Hotel projects for National Window manufacturer and Distributor for projects across the United States.
Provided material takeoff services for General Contractor for this 67,000 SF addition an existing school in Charleston, SC. Work consisted of material takeoff services for concrete drywall, paint, finishes, insulation, doors, hardware and specialties.
Material quantification for foundation package, roofing and exterior finishes for new 80,000 square foot three story medical facility in Mount Pleasant, SC. Project valued at $18,200,000.
Preconstruction services in support of the winning bid for a large capital improvement project for the City of North Charleston in SC. Project consists of 17 buildings including a 23790 SF office building, a 30,00 SF vehicle maintenance garage and other related support structures. Services provided were for foundations, slabs, structural masonry, brick veneer, cast stone and rough carpentry. Project valued at $35,000,000.
Framing, finishes, exterior sheathing material quantification services for military dining facility located in Paris Island, SC; approximately 50,000 square feet, valued at $20,000,000. Department of the Navy, Naval Facilities Engineering Command.
Tenant improvement work for 21,880 SF of office space located in Arlington Virginia. Work completed included demolition and construction of interior partitions, plumbing, electrical, data and finishes.
Preconstruction services for the construction of a new swim and racquet facility to be constructed in North Charleston SC. Complete labor and material estimation services for all divisions in the General Contractor's scope of work (underground site work, grading, restaurant equipment and pool not included in bid package). Project includes two buildings for a total of 6370 SF, which contain a bar, dining room, kitchen and exercise/flex room. Site work and related structures included bike barn, cabanas, trellises, decks and patios. Estimating services and presentation materials for this project resulted in a win for the General Contractor. Project valued at $1,4000,000.
Material quantification for maintenance facility project as part of Naval Facilities Engineering Command Southeast in Charleston SC. Project included framing, finishes, doors and frames. Project size is 4392 SF. Project valued at $358,000.
Assembled complete bill of material for new 16,000 SF Huntsville Alabama prototype restaurant facility. Estimate included all materials for wood framing, steel framing, finishes, roofing, doors and hardware, toilet partitions, plumbing, mechanical, electrical, low voltage and lighting packages.
Bill of materials for 48,000 SF renovation to existing Harris Teeter store in Charlotte NC.
Complete demo and replacement quantification of all exterior elements including: roofing, siding, sheathing, brick veneer, windows, doors, exterior trim, rails, gutters, AC disconnects, fire alarm, vents, signs, louvers, shutters etc. This project consists of one single pedestal style 3-story structure with parking below. 24 total units, multi-family condominium conversion with approximately 33,000 SF. Project valued at approximately $2,300,000.
Complete Bill of Material for rough framing package for 24000 SF wood framed worship facility located in Salt Lake City Utah including truss package and engineered lumber.
Complete Bill of Material for rough framing and drywall packages for 64,000 SF Assisted Living Facility in Houston TX including truss package and engineered lumber.
Material and labor takeoff for the flooring of a 16,475 SF medical facility addition in West Ashley SC.
Waterproofing material quantification for 115,000SF, 4 story luxury resort and marina facility located in Mount Pleasant SC
Steel Stud Framing, drywall, flooring and finishes material quantification services for 3800 SF maintenance Facility Building located in Goose Creek SC
Design development phase labor and material quantification for demolition and tenant improvement project including steel stud framing, drywall and finishes for 60,000 SF of office complex space. Project was to be built in West Ashley SC but was scrapped and relocated after budget pricing.
Material and labor quantification for stucco, masonry, aluminum curtain wall system, composite metal panel and foam formed trim components. Project value of $140,000.000 with a 5 building campus situated on a 100 acre site. Project to boast 165 independent living residences and 60 on site private apartments, clubhouse and office space.
Complete material and labor quantification for concrete, masonry, framing, steel, decking, drywall, insulation, doors, hardware, bath accessories and paint for the new Dorchester School District 2 Elementary School Type IIB Educational Facility to be constructed in Summerville SC. Project including alternates designed at 105,947 SF. Anticipated project cost of $29,000,000.
Siding and exterior trim package for 36,000 SF Higher Education Facility located in Clyde NC. Services turned into a great win for local SC Siding Contractor.
Steel stud framing, paint and drywall material and labor quantification services for the new 51,000 SF worship facility located in North Charleston SC.
Concrete material and labor quantification for high end 5600 SF custom coastal home located on the tip of Sullivan's Island in the Charleston Harbor of SC.
Framing, siding, deck, interior and exterior trim packages quantified for 7 home plans with complete bill of materials categorized into specific phase related lumber.
Preconstruction services for the Interior Design Development package of the Gaillard Municipal Auditorium project valued at $142,000,000 with 332,000 SF of occupied space. Project consists of the renovation and addition of the existing Gaillard Performing Arts Center in the historical downtown peninsula of Charleston, SC. Project design is to renovate the existing facility and convert it to a mixed use facility consisting of a new world class Performing Arts Center, adjoining exhibition hall, and municipal office suites. Preconstruction services including material quantification, consulting, bid and scope review, with joint venture team, city officials, and design consultants to help team and city bring huge economic impact project within budget for award. Specialized role providing key technical services as well as coordination effort to assist team with huge win for the team and all stakeholders. Concentrations on divisions 10, 11 and 12 including: Photo Luminescent Marking System, Toilet Partitions, Toilet Accessories, Operable Panel partitions, Architectural Grilles, Impact Resistant Wall Protection, Fire Extinguisher Cabinets, Lockers, Orchestra Shell, Demountable Platforms, Stage Rigging and Draperies, Theatrical Lighting Controls, and Auditorium Seating.
Provided material quantification services for the framing and drywall of a new twelve story hospital in Escondido California. This new facility contains 360 patient beds, 12 operating rooms, as well as a Trauma Center. The project is approximately 730,000 square feet with a total value near $800,000,000.
Material quantification services for demolition, framing and finishes of lobby and common areas, exterior canopies and roof elements in Arlington Virginia. Project is a 12 story high rise tower with approximately 480,000 square feet.
Material quantification for foundation package, roofing and exterior finishes for new 80,000 square foot three story medical facility in Mount Pleasant, SC. Project valued at $18,200,000.
Framing, finishes, exterior sheathing material quantification services for military dining facility located in Paris Island, SC; approximately 50,000 square feet, valued at $20,000,000. Department of the Navy, Naval Facilities Engineering Command.
Complete material quantification for all elements needed for the framing, drywall, insulation and ACT, for the new 210,000 square foot terminal expansion valued at $130,000,000.
Provided detailed lumber takeoff for a new 5 story Multi-Family wrap style apartment project for General Contractor. Detailed takeoff enabled General Contractor to save a considerable amount of money by purchasing the lumber package direct, instead of buying out turn-key package. Project consists of conventional wood framing, mixed with partial concrete podium with light gauge metal framing and parking garage.
Complete demo and replacement quantification of all exterior elements including: roofing, siding, sheathing, brick veneer, windows, doors, exterior trim, rails, gutters, AC disconnects, fire alarm, vents, signs, louvers, shutters etc, as well as select structural framing. This project consists of seventeen buildings with 408 units, three story multi-family condominium conversion with approximately 473,000 square feet.
Material quantification for maintenance facility project as part of Naval Facilities Engineering Command Southeast in Charleston SC. Project included framing, finishes, doors and frames. Project size is 4392 square feet.
Material quantification services for all structural and architectural components for the reconstruction and addition of ultra high end Caribbean resort home of Richard Branson, chairman of the Virgin Group of companies, during the Design Development phase. Components estimated include cast in place concrete, structural steel, masonry, framing, decks, and finishes. Home is approximately 20,500 SF under roof with an additional 15,000 SF of terraces and decks.
Complete material quantification services for Desalinization plant. Project consists of an 8700 SF reinforced concrete structure with stucco and masonry exterior, TPO roof with Photovoltaic Panels. Material quantified included complete purchase list of all structural concrete, site cast concrete, reinforcing, accessories, mill work, finishes, miscellaneous metals, thermal and moisture protection, and miscellaneous specialties.
Complete material estimation services for resort home located on the island of Nevis in the Caribbean islands. Project consist of 3470 SF luxury resort home with 550 SF terrace and outdoor living area; designed with concrete and masonry construction. Materials estimated include landscaping hard scape, concrete, reinforcing, masonry, framing, roofing, finishes, electrical, data and security.
Material quantification for flooring of an apartment complex consisting of 12 apartment buildings plus a leasing office located in North Charleston, SC.
Material estimating services and labor scope identification for the demolition and renovation of a 12 building condominium project and clubhouse. Material and labor quantification for demolition, landscaping, decks, siding, stucco, framing, doors and windows, roofing, concrete slabs, flooring, insulation, paint, mold remediation, HVAC, electrical, and fire suppression. Electronic material takeoffs and site verification of conditions in the field; were conducted as well as photo documentation of all buildings per recommendation of structural engineer. Project consists of 230 units plus a clubhouse with 308,000 SF of occupied space plus stairways, breezeways, decks and ramps.
Framing, drywall and ACT for new 14,000 square foot parish center in Charleston, SC
Comprehensive Metric material takeoff for foundation, structural concrete, concrete reinforcing, framing, roofing, doors, windows, ceramic tile, and landscape pavers for the resort clubhouse located in Divi Village in Galileistraat Aruba.
Flooring takeoff for the new Boeing Manufacturing facility in North Charleston, SC
Other Projects include material quantification projects include masonry takeoffs for the Hilton Garden Inn located in Edmond Oklahoma, several big box retail projects in the Dallas Texas area including Petsmart, LA Fitness, a Kroger shopping center, Chase Bank, Washington Mutual Bank, Discount Tire Center, a Harris Teeter renovation in Charlotte, NC and others. Local work includes: renovation, flooring, concrete, roofing, framing, drywall, flooring, demolition and ACT for a multi phased three story Office renovations. Residential work include complete material takeoff lists for concrete, masonry, framing, gypsum wallboard, roofing and exterior trim for local projects, high end residences in St Kitts, Nevis, and Tennessee. MBC Office Renovation located in Arlington VA renovation, exterior trim package for Haywood Community College in Clyde, NC, and several others.
Acoustical Panel Ceiling material quantification for new twelve story high rise medical hospital located in the Charleston, SC Peninsula. Total Project value estimated at $385,000,000.
Stucco and roofing material quantification for extensive renovation of 2 Luxury High Rise
Oceanfront Multi-Family Condominium towers located in Myrtle Beach, SC. The Portifino Building is an 11 story high rise with attached tuck under podium parking garage with 142,501 GSF. The Barcelona Tower is a 14 story tower with attached podium tuck under parking garage with 185,587 GSF.
Provided training for Project Managers, Field Personnel, President, and Vice President for local mid size General Contracting Company, and high volume local Stucco Contractor.